Project: jseaborn   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Jeff Seaborn   -  
Project:   Dalotel DM165   -   VIEW REPORTS
Total Hours:653
Total Flight Time:
Start/Last Date:Nov 06, 2019 - Nov 06, 2019
Engine:Originally Continental IO-346 A what? Yep, an IO-346 as used in Muskateers of the same vintage
Propeller:A Regy Wooden Fixed Pitch What the heck is that? A French prop from that era
Panel:Steam gauges circa 1969. In French and in metric. Yikes!
 
Friendly URL: https://eaabuilderslog.org?s=jseaborn

Home or Last Project Picture

Jan 08, 2022     Brakes - (2 hours)       Category: Controls
Fabricated a new lower bracket for the RH brake pedal. Trimmed it to fit tightly against the existing rudder pedal assembly when welded into place.

The aluminum sleeve from original heel brake assembly needed to be removed. The inner sleeve on the LH rudder pedal had melted when the lower bracket was welded to the outer tube. The inner sleeve was loose in the tube but was hung up. I didn't want it to loosen with time and fall out at an inopportune time so I drilled out and fully removed the aluminum inner sleeve. I did the same with the sleeve on the RH pedal as it would melt when the bracket was welded to its corresponding tube. Photo to follow.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.